This a recent project completed for one of our many regular clients which involved a combined foul and storm sewer connection in the North West London area.

• A 4.5m deep shaft was excavated onsite with trench sheets and steel pump out frames.
• 13m of timber heading was driven into Thames Water’s culvert sewer.
• 300mm clay pipework was installed, and backfilled with dry lean concrete.
• A backdrop was connected into a newly constructed manhole.