Foul Connection works at London’s Queen Elizabeth Olympic Park Development.

  • 2no shafts were excavated to depths of 4m and 8m
  • A total of 40m of timber headings were driven
  • A new 2100ID manhole with an intermediate landing slab was constructed on top of the existing 600mm Thames Water
    sewer line.

Many obstructions were encountered during the works, including concrete in the ground, existing live services and ground water.