Tunnelling in the West End in Central London at the 334 Oxford Street Project.

• 9m of timber heading driven from basement to Thames Water culvert

As per the procedure when working on many of our basement projects, a working platform was installed, and an opening for the heading was core drilled through the existing RC wall.